Hoyt Hall will experience a power shutdown of the
LV-1 (Main Lighting and Receptacle Feed)
When: Tuesday, 2/27 between 5 and 7 pm
What should you expect?
- Power to most of the lights and electric receptacles in Hoyt will be shut down.
- Elevators should work but the lights in them may not. Use the stairs.
- The Data Center and emergency building power will NOT be affected.
- Shut down and unplug all electronics and appliances during this period to avoid possible damage.
On a side note:
A concrete pad located in the basement of Hoyt will be removed Thursday 2/22 or Friday 2/23. This will require the use of a jackhammer and may be accompanied by “a little noise”.